Parking Maintenance Schedule | April 8-16, 2017

Parking/Contractors/Facility Services:

  • Field House Drive between South Campus & South Stadium will be closed April 8-16
  • Bus lane asphalt repair on Field House Drive at bus shelter by Journalism and Lockett Hall (Saw Cutting on Saturday, April 8 and repair work Monday, April 10 – Thursday, April 14)
  • Asphalt repair patch of large potholes in the UREC Greek Row Central lot (Anytime between Monday, April 10 – Thursday, April 14)
  • Repair of erosion failure by drainage in the old C-149 student lot area (Monday, April 10 – Thursday, April 13)

Parking Maintenance (Weather Permitting):

  • Re-Stripe Raphael Semmes Drive in front of the Student Union to include adding a 15-minute Loading/unloading area in the indented area in front of the steps (Monday, April 10)
  • Add parking spaces in E. Frat Circle (Monday, April 10)
  • Re-Stripe the Facility Services Annex East Lot (Tuesday, April 11)
  • Re-Stripe student area in garage, Floors 4 -6 (Tuesday, April 11)
  • Re-Stripe Cypress Hall North Gravel Lot (Wednesday, April 12)
  • Re-Stripe C-1 T. Boyd Hall Lot (Thursday, April 13)
Bus Service